Insulation Primer

Insulation Primer

BARKKAFT INSULATION PRIMER; It is a new generation nano-technology liquid thermal insulation primer with a water-based elastic structure, consisting of a homogeneous mixture of boron and perlite with a binder.

It eliminates dents, cracks, scratches and roughness on the surface to be painted, and ensures a long life by ensuring that the insulation paint adheres to the surface better. Additionally, when insulation paint is applied to an unprimed floor, much more paint is consumed.

Barkkaft Insulation Primer has a different function compared to normal primers due to its insulating feature and cannot be compared in terms of benefit value.

  • Boron mine was used.
  • It makes it easier for Insulation Paint to save up to 50% energy.
  • Ease of application, since it is based on application, it can be applied more easily with a roller, brush or spray, saving time and money.
  • It can be applied to all surfaces.
  • It has a flame retardant feature.
  • Its color is white.
  • It is not affected by wind and salt.
  • Since it adheres to the plaster in buildings, it provides performance as long as the plaster life (40-50 years).
  • It can be applied to any surface such as plastic, metal, concrete, brick, wood, etc.
  • It is environmentally friendly and does not contain substances harmful to human health.
  • It helps provide high efficiency in energy efficiency.
  • On Interior and Exterior Facades of Buildings
  • On Roofs and Ceilings
  • On Balconies and Porches
  • In Prefabricated Buildings
  • In Cold Storage
  • It can be applied on all surfaces.

COLOR: White. It can be colored with pigment. Water-based paint can be applied on it.
CONSUMPTION: If applied with a maximum thickness of 2 mm: Consumption amount is 25-28m²/bucket. Application conditions have been evaluated excluding ground, weather conditions and different uses.
PACKAGING: In 18 L plastic buckets.
SHELF LIFE: If stored in unopened and undamaged packages, it has a shelf life of 24 months from the date of production.
STORAGE CONDITIONS: Store in a dry and cool environment in weather conditions above 0ºC.

APPLICATION:

  • If there is a mistake or break in the plaster, repair it and wait for the drying time.
  • After the bucket lid is opened, it should be mixed with a drill at medium speed.
  • Water should never be added to the insulation.
  • 4-5 hours after primer application (drying varies depending on weather conditions)
  • The first layer of Barkkaft insulation coating is applied. After at least 6 hours or complete drying, the 2nd and, if desired, the 3rd coat can be applied.
  • The application is applied with a brush or roller, it can also be sprayed with an airless machine.